An Approach Based on Bayesian Network for Improving Project Management Maturity: An Application to Reduce Cost Overrun Risks in Engineering Projects - Université Jean Moulin Lyon 3
Article Dans Une Revue Computers in Industry Année : 2020

An Approach Based on Bayesian Network for Improving Project Management Maturity: An Application to Reduce Cost Overrun Risks in Engineering Projects

Felipe Sanchez Garzon
  • Fonction : Auteur correspondant
Jean-Pierre Micaëlli
  • Fonction : Auteur
  • PersonId : 871547
  • IdRef : 034635777

Résumé

The project management field has the imperative to increase the success probability of projects. Experts have developed several Project Management Maturity (PMM) models to assess project management practices and improve the project outcome. However, the current literature lacks models that allow experts to correlate the measured maturity with the expected probability of success. The present paper develops a general framework and a method to estimate the impact of PMM on project performance. It uses Bayesian networks to formalize project management experts’ knowledge and to extract knowledge from a database of past projects. An industrial case concerning large projects in the oil and gas industry is used to illustrate the application of the method to reduce the risk of project cost (or budget) overruns.
Fichier non déposé

Dates et versions

hal-04460061 , version 1 (15-02-2024)

Identifiants

Citer

Felipe Sanchez Garzon, Eric Bonjour, Jean-Pierre Micaëlli, Davy Monticolo. An Approach Based on Bayesian Network for Improving Project Management Maturity: An Application to Reduce Cost Overrun Risks in Engineering Projects. Computers in Industry, 2020, 119 (2020), pp.103227. ⟨10.1016/j.compind.2020.103227⟩. ⟨hal-04460061⟩
112 Consultations
0 Téléchargements

Altmetric

Partager

More